NEW CAPITAL POWER PLANT MAKE-UP
The project site of the power plant will extend over an area of 744,811m². The plant will integrate eight Siemens SGT5-8000H high-efficiency combustion turbine generators (CTGs), eight Benson heat recovery steam generators (HRSGs), four SST-5000 steam turbine generators (STGs) and four air-cooled condensers. Each combined-cycle module will have a rated capacity of 1,200MWe.
The balance of plant (BOP) systems will include a diesel generator, transformers and switchgear as well as associated mechanical / electrical subsystems. The dual-fuel plant will use natural gas as primary fuel and light fuel oil as a back-up fuel. It will receive natural gas from a new underground connection pipeline, while light fuel oil will be supplied by trucks from Musturod or Helwan oil refineries.